Hickling Barn

We have installed and commissioned a foxes battery system in the "Hickling Barn Community Centre, Tate Loke, Mallard Way, Norwich, NRT12 0YU". The job featured a 3-phase 10kW Foxes AC coupled Inverter and a 21.5kWh Foxes battery system (5x 4.3kWh energy cube batteries).

    • Case Study
    • Hickling Barn
    • August 01, 2023